SL/TL long lead screws

Liên hệ

Features
• Nominal diameter from 25 to 50 mm
• Lead from 20 to 50 mm
• Lubrication hole for grease nipple or for automatic lubrication kit
• Standard protection at each end of the nut with composite wipers integrated into recirculation caps (NOWPR)
• Optional double protection at each end of the nut with additional brush wipers fitted into recirculation caps (WPR)
• Optional surface coating on shaft and nut
• Optional safety nuts. Please contact Ewellix for selection and usage of this option.

SL/TL long lead screws | Vít me bi Ewellix được sử dụng rộng rãi trong nhiều ứng dụng khác nhau, yêu cầu độ chính xác cao.

Rolled thread ball screw for high linear speed

Features
• Nominal diameter from 25 to 50 mm
• Lead from 20 to 50 mm
• Lubrication hole for grease nipple or for automatic lubrication kit
• Standard protection at each end of the nut with composite wipers integrated into recirculation caps (NOWPR)
• Optional double protection at each end of the nut with additional brush wipers fitted into recirculation caps (WPR)
• Optional surface coating on shaft and nut
• Optional safety nuts. Please contact Ewellix for selection and usage of this option.

Benefits
• High rotational speed up to nd0 = 90 000, resulting in high linear speed up to 110 m/min
• Nut design well suited for transport and positioning screw applications requiring high velocity such as woodworking, some functions in plastic injection presses, pick–&–place, etc.
• Backlash elimination (TL designation).

Trục vít SL-TL-long-lead-screws